
![]() |
![]() |
|
Click any of the thumbnail photos for a larger view. Each image will open in a new window.
Sign up for Sail Mail to receive e-mail notices of coming events, LAMI activities and news related to the Twin Brigantines. We'll also let you know when additions are made to the Archives. It's free and easy...get details on our CONTACTS page. December 28, 2002 >>>>>>> Construction is moving ahead quickly with only a brief break to celebrate the Christmas holiday. Sea trials are expected to begin next month on the Irving Johnson, with Exy to follow in March or April, 2003. Time is critical: the vessels are scheduled to be delivered to the Maritime Institute and begin service in early 2003. The annual "Christmas Afloat" parade through the Main Channel of the Los Angeles harbor saw the Twin Brigantines decked out with holiday lights and decorations. The December 7th event was the first time the two vessels were seen in public together since their launch last April. Berths have been installed on both vessels. Carpenters are joined by painters in nearly every cabin above and below deck as finishing touches and trim work are added. The installation of heads and showers is well underway. Both vessels have newly installed stoves and refridgerators in their galleys; custom built cabinets are being fitted for installation in the days ahead.
|
|||||||||||
Copyright © 2001-2007 by Lee Uran, San Pedro, California.
All rights reserved.
No portion of the site, including all photographs and graphics, may be reproduced
without permission.
www.LeeUran.com